Strengthening of Plot structure no-g-3/3, Model Town, Delhi Plot No. G-3/3 of Model Town, Delhi is a G+2 masonry structure requiring strengthening due to cracks in the main load bearing walls, columns and parapet walls. The main reason for deterioration is due to uneven settlement of foundation as the building is load bearing structure. The [...]
TCG BENGAL ECO INTELLIGENT PARK, KOLKATA
Buildings
TCG BENGAL ECO INTELLIGENT PARK, KOLKATA The structure required strengthening of beams at ground, first, second, third, fourth, fifth and twelfth floor levels due to change of loading The Client also carried out Non Destructive Testing (NDT) of columns at certain floor levels which indicated that the grade of concrete was less than required. To [...]
SBI Quaters – Wadala
Buildings, Hospitals
SBI Quaters - Wadala It is a long established fact that a reader will be distracted by the readable content of a page when looking at its layout. The point of using Lorem Ipsum is that it has a more-or-less normal distribution of letters, as opposed to using 'Content here, content here', [...]
Pidilite
Buildings, Hospitals
Pidilite It is a long established fact that a reader will be distracted by the readable content of a page when looking at its layout. The point of using Lorem Ipsum is that it has a more-or-less normal distribution of letters, as opposed to using 'Content here, content here', making it look [...]
L&T MIAL – Mumbai International Aiport
Buildings, Hospitals
L&T MIAL - Mumbai International Aiport It is a long established fact that a reader will be distracted by the readable content of a page when looking at its layout. The point of using Lorem Ipsum is that it has a more-or-less normal distribution of letters, as opposed to using 'Content here, [...]
Indiabulls Green – Panvel
Buildings, Hospitals
Indiabulls Green - Panvel It is a long established fact that a reader will be distracted by the readable content of a page when looking at its layout. The point of using Lorem Ipsum is that it has a more-or-less normal distribution of letters, as opposed to using 'Content here, content here', [...]
Ashar IT Park – Thane
Buildings, Hospitals
Ashar IT Park - Thane It is a long established fact that a reader will be distracted by the readable content of a page when looking at its layout. The point of using Lorem Ipsum is that it has a more-or-less normal distribution of letters, as opposed to using 'Content here, content [...]
Rajiv Gandhi Cancer Institute & Research Centre, Rohini, New Delhi
Buildings, Hospitals
Rajiv Gandhi Cancer Institute & Research Centre, Rohini, New Delhi Rajiv Gandhi Cancer Institute & Research Centre, Rohini, New Delhi, one of the best cancer treatment hospital in India is undergoing certain addition/ alteration in the existing structure & therefore certain NDT was done on the structure at certain earmarked locations. The main [...]
India Bulls, Elphinstone road, Mumbai
Buildings
Synopsis: Applying anchor plates and Fiber Wrapping Site Application:
Deloitte Project of Larsen & Toubro Ltd, Hyderabad
Buildings
Synopsis: Action Taken: Due to expanding the area for change in usage and addition of extra load of kitchen machineries, cold storage and other attachments the complete slab of 25mtrs x 15mtrs was strengthened with the Non Pre-stressing Laminate system designed uniformly in a grid form to increase the load bearing strength. Site Application: [...]
Syndicate Bank Quarters, Ghatkopar
Buildings
Synopsis: The Structure was not fit for use and declared for demolition Action Taken: We have taken the assignment with a challenging aspects & confidence, Eligibility to face the task with technically as well as practical solutions, Utilizing conventional & CFRP System to achieve the goal in full respect. Site Application:
Ackruti Trade Center, Marol, Mumbai
Buildings
Synopsis: Ackruti Trade Center Action Taken: Fibre Wrapping The ackruti trade center owned be Hubtown had undergone fire at the 6th & 7th floor of the structure. The dome structure was damaged and the structure was distressed as per the consultants decision. The building had to be rehabilitated and strengthened as soon as possible.It [...]
Platina Wadhva Complex – BKC, Mumbai
Buildings
Synopsis: Due to change in usage of slab. A change in floor load capacity of the existing structure required it for slab strengthening. The strengthening was done using carbon fibre laminates and composite fibre wraping system. Action Taken: Enhancement of petty slab by non pre-stressing & pre-stressing technology. Site Application:
Classic City – Pune
Bridges, Buildings
Synopsis: The stucture was not strong to take the designated load. Action Taken: Strengthening was done with FRP system because the Grade of Concrete was low comparatively, has not acheived the strength as per the designed specification. Site Application:
IT Park – Chennai
Buildings
Synopsis: Strengthen the 25m x 50m long sagged slab Action Taken: Due to early removing of shuttering the 25m x 50m long slab got 100m sagged which becomes inadequate for the structure to bear the designed load. With the help of Pre-stress system the slab was up-lifted back by stretching the CFK Laminates at a [...]
Reliance Special Economic Zone (NMSEZ), Navi Mumbai
Buildings
Synopsis: Strengthening of Waffle and Fringe beams A change in usage of a 9 storied building required the beams to be strengthened. More than 200 beams are to be strengthened in each building to achieve desired result. A full design of Strengthening was proposed which is now undergoing. The strengthening is done using carbon fibre [...]
Mithi River, L & T, Mumbai
Buildings
Synopsis: Rehabilitation Laminates Below the Girders, Strengthening of openings inside, Structural Steel
Infosys Delhi
Buildings
The proposed Guest house under construction for M/s. Infosys Technologies at Vasanth Vihar, New Delhi is a typical RC framed structure with infilled brunt brick masonry walls. The building comprises of basement, stilt, ground + 3 upper floors (6 slabs). The structural system is basically a beam slab system. The deficient columns were decided to [...]