Buildings

/Buildings
­

Reliance Special Economic Zone (NMSEZ), Navi Mumbai

,

A change in usage of this 9 storied building required beams at various levels to be strengthened. More than 200 beams are to be strengthened in each building to achieve desired result. A full design of strengthening was proposed which was approved by the Structural Consultant. The strengthening is done using [...]

J W Marriot

,

The slabs and beams at 1st floor level of JW Marriot, Chennai required strengthening due to change in loading. This change in loading was attributed to the increase in loading due to addition of stone platforms and murals on the existing structure. The strengthening in the deficient slabs was carried out [...]

Seismic Retrofitting of the building to be changed to Guesthouse for Infosys, Delhi

,

The proposed Guest house under construction for M/s. Infosys Technologies at Vasanth Vihar, New Delhi is a typical RC framed structure with infilled brunt brick masonry walls. The building comprises of basement, stilt, ground + 3 upper floors (6 slabs). The structural system is basically a beam slab system. The concerned [...]

Infoys

,

Action Taken

Air Force thane

,

Action Taken

Classic city pune

,

Synopsis: The structure was not strong to take the designated load. Action Taken Strengthening was done with FRP system because the Grade of Concrete was low comparatively, has not achieved the strength as per the designed specification.

Deloitte Project of Larsen & Toubro Ltd, Hyderabad

,

Action Taken Due to expanding the area for change in usage and addition of extra load of kitchen machineries, cold storage and other attachments the complete slab of 25mtrs x 15mtrs was strengthened with the Non Pre-stressing Laminate system designed uniformly in a grid form to increase the [...]

Department of Ocean Engineering, IIT-Madras

,

Synopsis: Strengthening of Fire Burned Structure Action Taken "Department of Ocean Engineering" at IIT, Chennai has gone under Fire due to which the concrete has lost the strength and the same was treated with the help of R&M CFRP System to regain the strength of the following structure. [...]

ESIC Hospital, Banglore

,

Synopsis: The 50 year old building needed strengthening Action Taken The 50 years old masonry structure was strengthened by pre-stressing method.

ESIC Hospital, Lower Parel, Mumbai

, ,

The complete project of G + 8 stories building was strengthened and confined with E-Glass 900gsm & relevant Resins supplied by us.

Jagdish Malani, Alibag

,

Action Taken

Mantralaya, Mumbai

,

Action Taken

blog lam dep | toc dep | giam can nhanh

|

toc ngan dep 2016 | duong da dep | 999+ kieu vay dep 2016

| toc dep 2016 | du lichdia diem an uong

xem hai

the best premium magento themes

dat ten cho con

áo sơ mi nữ

giảm cân nhanh

kiểu tóc đẹp

đặt tên hay cho con

xu hướng thời trangPhunuso.vn

shop giày nữ

giày lười nữgiày thể thao nữthời trang f5Responsive WordPress Themenha cap 4 nong thonmau biet thu deptoc dephouse beautifulgiay the thao nugiay luoi nutạp chí phụ nữhardware resourcesshop giày lườithời trang nam hàn quốcgiày hàn quốcgiày nam 2015shop giày onlineáo sơ mi hàn quốcshop thời trang nam nữdiễn đàn người tiêu dùngdiễn đàn thời tranggiày thể thao nữ hcmphụ kiện thời trang giá rẻ