Project Description
TCG BENGAL ECO INTELLIGENT PARK, KOLKATA
The structure required strengthening of beams at ground, first, second, third, fourth, fifth and twelfth floor levels due to change of loading
The Client also carried out Non Destructive Testing (NDT) of columns at certain floor levels which indicated that the grade of concrete was less than required. To further check and propose strengthening measure for the same M/s Twenty First SHM Consultants Pvt Ltd carried out pull off testing on few columns showing reduced grade
Action Taken
- In this project strengthening with FRP composite system has been proposed to increase the capacity of deficient beams and slabs at various floor levels.