projects

/projects
­

Jagdish Malani, Alibag

,

Action Taken

Mantralaya, Mumbai

,

Action Taken

Asmeeta Hubtown Pvt Ltd

,

Asmeeta Hub town is a commercial building located at kalyan. The columns at 1st & 2nd. level required strengthening due to deficiency in grade of concrete observe after NDT done by client. Hence, it has been proposed to strengthen the Column as per deficiency. All the details and drawings available on [...]

Vidyalankar Institute of Technology

,

Vidyalankar Institute of Technology in Mumbai required strengthening due to corrosion And cracks obsereved in various columns and beams. The affected column and beams were decided to retrofitted by using carbon fibre. Action Taken

Meenakshi Tower, Hyderabad

,

In an Existing commercial building Meenakshi tower in Hyderabad, structural conditional assessment of slab was intended to adopt appropriate measures to increase the load carrying capacity. The following options of retrofit measures are adopted by providing prestress and groove laminates of carbon fibre. Action Taken

Jindal Villa, Mumbai

,

In an Existing Jindal Villa in Mumbai, structural conditional assessment of slab was intended to adopt appropriate measures to cut out the slab portion in circular manner to the way to staircase. The following options of retrofit measures are adopted by providing non prestress of carbon fibre. Action Taken [...]

NCR Raheja, Mumbai

,

NCR Raheja is a commercial building in mumbai. In an Existing commercial building NCR Raheja in Mumbai, structural conditional assessment of slab was intended to adopt appropriate measures to increase the load carrying capacity and the strengthening work carried out by using carbon fibre laminate. Action Taken

NICMAR College, Pune

,

Nicmar college of Engineering is a Institutional building located at pune. The columns at 5th floor level required strengthening due to deficiency in grade of concrete observe after NDT done by client. Hence, it has been proposed to strengthen the Column as per deficiency and strengthening done by using carbon fibre [...]

G+1 building at Hosangabad, Bhopal

This is G+1 residential building located at Hosangabad, Bhopal. Due to deficiency in concrete grade and r/f percentage strengthening is proposed by using carbon fibre and glass fibre and prestress and non prestress laminates for slab.

Romell Group

Romell group is a residential building located in Mumbai. Due to removal of middle support of curved beam strengthening is needed here. To increase load carrying capacity of beam after removal of column strengthening is done by prestress and non prestress laminate and carbon fibre wrapping.

ESDS Data Centre, Mahape, Navi Mumbai

In an Existing commercial building in Mahape, a portion of RCC flat Slab is proposed to be used as server room. It was intended to adopt appropriate measures to enhance slab load to carter to the increased loads proposed be imposed. The following options of retrofit measures to achieve slab capacity enhancement is proposed by [...]

Pidilite – Andheri

,

Pidilite Andheri In an Existing commercial building  Kondivita in Andheri, structural conditional assessment of columns at ground floor. It was intended to adopt appropriate measures to enhance major cracks & concrete cover delamination  in periphery of column. The following options of retrofit measures to repair severe cracks by providing steel [...]

Infosys

Infosys Infosys is a well know IT Sector industries a said project is located in Hyderabad. Due to placing of Cooling tower on beam & column a strengthening is required for up gradation in structural element (Column & beam) with the help of FRP Retrofitting techniques. Action Taken:

Tharwani Infrastructures

Tharwani Infrastructures Tharwani Infrastructures is a well known residential building, due to increase in floors a column is to strengthened for desired load capacity with the FRP system by carbon fiber wrapping. Action Taken:

KRC Raheja , Hyderabad

KRC Raheja , Hyderabad In an Existing commercial building in Hyderabad, a portion of RCC (PT) flat Slab is proposed to be used as UPS battery room/server room. It was intended to adopt appropriate measures to enhance slab load to carter to the increased loads proposed be imposed. The following options of retrofit measures [...]

blog lam dep | toc dep | giam can nhanh

|

toc ngan dep 2016 | duong da dep | 999+ kieu vay dep 2016

| toc dep 2016 | du lichdia diem an uong

xem hai

the best premium magento themes

dat ten cho con

áo sơ mi nữ

giảm cân nhanh

kiểu tóc đẹp

đặt tên hay cho con

xu hướng thời trangPhunuso.vn

shop giày nữ

giày lười nữgiày thể thao nữthời trang f5Responsive WordPress Themenha cap 4 nong thonmau biet thu deptoc dephouse beautifulgiay the thao nugiay luoi nutạp chí phụ nữhardware resourcesshop giày lườithời trang nam hàn quốcgiày hàn quốcgiày nam 2015shop giày onlineáo sơ mi hàn quốcshop thời trang nam nữdiễn đàn người tiêu dùngdiễn đàn thời tranggiày thể thao nữ hcmphụ kiện thời trang giá rẻ