Bridges

/Bridges
­

RAIL OVER BRIDGE AT KATPADI, TAMIL NADU

The Rail Over-Bridge structure at Katpadi Junction of Southern Railway was completed in 1996. The scope of work is to implement different repairs and retrofitting methods in order to restore the bridge into its original condition. Before Strengthening of bridge various testing were done on Bridge. Action Taken

Mandavi River Cable Stay Bridge, Panaji Goa

Site Name :Mandavi River Cable Stay Bridge , Panaji Goa Segment Fiber Wrapping & Injection grouting work at Mandavi River Cable Stay Bridge , Panaji Goa Action Taken

Aplappuza Bridge, Kerla

Aplappuza Bridge, Kerla Shear Strengthening of Pier Cap P82 Using CFRP Action Taken

Pul Mithai Bridge, Delhi

Strengthening of Columns of Pull Mithai Bridge, Delhi, by using various repair methods such as jacketing ,fiber wrapping, anti corrosive treatment,Anti Carbonation Treatment, strengthening with pre -stress Laminates & Polymer modified mortar treatment to the distress area. Action Taken

RVNL BILAPSUR

RVNL BILAPSUR RVNL is a bridge section located at bilaspur, Chhattisgarh. A Strengthening is done due to deficiency in grade of concrete in piers and deficiency of temperature reinforcement. A Strengthening of piers by CFRP & groove laminate technique. Action Taken:

Railway Ratlam

Railway Ratlam Western Railway has proposed rehabilitation of PSC I girders on Bridge nos. 132, 114 & 54 of Godhra-Ratlam section of Ratlam Division of Western Railway. The bridges were constructed during 1958-60 and as such no detailed design & drawings are available. The bridges have composite PSC I girders supported on neoprene bearing. The [...]

Flyover National Highway 7, Bangalore

Synopsis: Strengthening to increase Load Capacity of Slab. A change in floor load capacity of the existing structure required it for slab strengthening. The strengthening was done using carbon fibre laminates and composite fibre wraping system. Site Application:

Classic City – Pune

,

Synopsis: The stucture was not strong to take the designated load. Action Taken: Strengthening was done with FRP system because the Grade of Concrete was low comparatively, has not acheived the strength as per the designed specification. Site Application:

Jawaharlal Nehru Port Trust, Navi Mumbai

Action Taken: The only Transportaion Bridge Between JNPT and cities. Due to extensive movement of Heavily loaded cargo vehicles in the past 12 years the bridge has lost its strength and started vibrating heavily causing a threat of collapse. The Turnkey Project involved Overall Strength enhancement of the spans. Strengthening was done by Epoxy Grouting, [...]

blog lam dep | toc dep | giam can nhanh

|

toc ngan dep 2016 | duong da dep | 999+ kieu vay dep 2016

| toc dep 2016 | du lichdia diem an uong

xem hai

the best premium magento themes

dat ten cho con

áo sơ mi nữ

giảm cân nhanh

kiểu tóc đẹp

đặt tên hay cho con

xu hướng thời trangPhunuso.vn

shop giày nữ

giày lười nữgiày thể thao nữthời trang f5Responsive WordPress Themenha cap 4 nong thonmau biet thu deptoc dephouse beautifulgiay the thao nugiay luoi nutạp chí phụ nữhardware resourcesshop giày lườithời trang nam hàn quốcgiày hàn quốcgiày nam 2015shop giày onlineáo sơ mi hàn quốcshop thời trang nam nữdiễn đàn người tiêu dùngdiễn đàn thời tranggiày thể thao nữ hcmphụ kiện thời trang giá rẻ